BIM is very complex procedure. In construction site all team input and gathers data and information and department involves in this process. Architects, engineers have built functional overview of running project by gathering information. They also can create 3D based different models.
Usage of BIM
BIM is used make different designs and document buildings. BIM can make every single detail of building. By using BIM architects also analyze design options. It helps to create visualization. Stakeholders can also understand about the building model by using BIM. BIM is also used to generate design documentation for construction.
Procedure of BIM
Plan of building – BIM can plan project by capturing reality and real-world data to make models. natural environment can also include there.
Design – in this section architects and engineers can analyze, design and do documentation process. this preconstruction process is possible by using BIM data.
Build the structure - by using BIM specification fabrication can be beginning. supply of project construction can be shared trades and contractors so that the construction takes much less time and efficiency.
Operate - Maintenance of finished work is carried over by BIM data. BIM data is also used to rebuild in low cost.
Published By
Arka Roy
www.bimoutsourcing.com
~~~~~~~~~~~~~~~~~~~~~~~~