The as-built drawings should always be updated and accurate to reflect reality. This is unquestionably an effective technique to save chronological information about the asset's building phase.
A good BIM management platform that enables you to handle 3D models, data, information, and open BIM procedures is another crucial factor.
As-build Checklist
Checklists for as-built drawings help to maintain the as-built drawings and also provide helpful information that can be used to verify that the drawings correspond to the actual asset.
In light of the actual conditions, the complexities of the construction site, the budget changes, and the varieties in progress, it has become necessary to rethink the initial idea of the project and, consequently, redraw the project drawings to reflect the new conditions.
Despite the most fluid construction process and the commitment to a more advanced BIM/VDC methodology, there is no guarantee that the actual building built will correspond exactly with the drawings prepared for the project.
As-built drawings
A set of as-built drawings describe in detail the condition of a building as it appeared at the end of the work or after a series of modifications have been made after the work was completed.
There is no longer a representation of the original project in the model; rather, it is a summary of the measurements, geometrical characteristics, and updated information that has been gathered from the asset.
Read more
Published By
Global Associates
www.bimoutsourcing.com
~~~~~~~~~~~~~~~~~~~~~~~~