According to the strategy, construction firm has to need work towards BIM level3 in 2025. In this level every worker will have access to building information in mobile app and they will understand what they have to do.
The case of cookham and wood prison is the perfect example of BIM level 2 where a contractor was invited for proposing a redesign of the facility. For improving visibility and illumination inside the prison the contractor proposed to use reinforce glass than traditional glass. During this proposal the government of prison accepted the idea.
The Success
In the industry everybody has taken the BIM level 2 very seriously and positive. There are many firms who are using BIM2. According to the source BIM 2 saves lots of money and precious time.
Affordable: BIM level 2 use 3D based model for clash detection. BIM level 2 save lots of money by identify and solve this problem early. For example, BIM level 2 identified 360 types of issues in a specific project. According to a source BIM level 2 saved more than £900,000 in a particular project.
Published By
Arka Roy
www.bimoutsourcing.com
~~~~~~~~~~~~~~~~~~~~~~~~