Setting up a proper level height
If you do not need elevations or 3D views at the time, you should still assign the walls to specific levels even if you do not require elevations or 3D views at that time.
Make sure that all of the required levels have been created by going to the elevation view. Ensure that they are set to the correct height, but if necessary, you can adjust them later.
Intersect walls from internal to external
It is still a good idea to place one of the corners of the building at the intersection of the internal origin of your project, regardless of your lack of concern about the coordinate system. Depending on the version of Revit that you are using, the internal origin in Revit 2020 and later is indicated by an arrow symbol.
A project origin point should not be confused with a project base point or a survey point. While all of these points should be in the same position at the start of the project, there is a difference between them. As the origin for CAD exports, this point will be used. In the same way, CAD files or other formats can be linked.
Visibility or Graphics can be accessed by the shortcut VG. To access the site submenu, scroll below. Verify the Internal Origin checkbox. Your plan view should display the arrow icon.